Dubai Metro Map with Expo 2020 New Route
Dubai Metro Map with Expo 2020 New Route
Dubai Metro Map with Expo 2020 is the expansion of Dubai Metro. It includes four new stations that show the stations on both the Red Line, Green Line, and Route 2020. It similarly indicates the vehicle zones that the stations lie in. If you usually travel through Dubai Metro, you should know about these routes.
At Union Square and The Burjuman Center, you will find two terminals where the Green and Red Lines will cross each other, and passengers will be fit to change the metro. The Red Line is 52.1 km long, including 4.7 km underground.
The Green Line of Dubai Metro starts at Etisalat and terminations at Creek (By Dubai Festival Center). The Greenline includes 20 terminals and serves domains in Deira (The old Dubai) essentially.
Exhibition 2020 Route is a new route ad it was introduced after the expansion of the Dubai Metro. It interfaces Jebel Ali Metro Station (Formerly known as Nakheel Harbor and Tower) to the Expo 2020 site.
The projects carry the Dubai Metro to networks like The Gardens, Dubai Investment Park, Al Furjan, Jumeirah Golf Estates, Discovery Gardens.
The line is 15 km long, in which raised segment is 11.8 km, and 3.2 km is underground. The underground passage will go from Al Furjan to the Green Community.
Dubai Metro Lines Route
Since 2009, RED LINE was started, and it runs from Rashidiya (close to Dubai International Airport) to UAE Exchange (some time ago Jebel Ali). Every one of the 29 stations is presently working.
Since 2011, GREENLINE was started. It runs from Etisalat Metro Station in Al Qusais to Creek in Al Jaddaf. Each of the 20 stations is currently operational.
In the metro expansion, route 2020 was introduced, and it is 15 km long. It will run from Jebel Ali Metro Station to the Expo 2020 site.
Dubai Metro Route 2020: opening on January 1, 2021, four new terminals was taken into operation.
In the announcement of opening, Mattar Mohammed Al Tayer is the Director-General, Chairman of the Board of Executive Directors of the Roads and Transport Authority (RTA), told about the expansion of the Dubai Metro line and uncovers many other aspects of the project, they are mentioned in below section.
They will focus on the four stations in the early stages, specifically: Jebel Ali (trade station), The Gardens, Discovery Gardens, and Al Furjan Stations, and the rest of the station will open after these.
At the starting of 2020, RTA gave a gift to the general public, which serves mainly populated regions possessed by 270,000 people like The Gardens, Discovery Gardens, Al Furjan, Jumeirah Golf Real Estates, and the Dubai Investment Park, just as the site of Dubai Expo.
There are many factors by considering them RTA decide which station needs to take in operation on priority base as people saturated close by the station, expected several riders, business activities in the stations served by the stations, and other public travel implies at each station.
The addition of new routes 2020 for the general public follows fruitful completions of four the operational tests and preliminaries that incorporated the static trial of metro carriages and frameworks, trial of the moving stock without travellers, the operational preliminary to check the framework reliability and stability, and the operational preliminaries completed by the administrator of the metro administration to confirm the availability before the beginning of the commercial service.
Service Timings of Dubai Metro Route 2020
“The initial journey of 2020 route will begin from Jabal Ali Station to Al Furjan Station and the other way. Journeys will begin at 5:00 AM and end at midnight from Saturday to Wednesday.
On Thursday, the initiative will begin at 05:00 AM, and the last journey will commence at 01:00 AM (of the next day).
On Friday, the initial route will begin at 10:00 AM, and the last one will be at 01:00 AM (of the next day).
The journey will take almost 6 minutes between Jabal Ali and Al Furjan stations. Service frequency will be 10 minutes at a rate of six trains each hour. This route has the capacity to serve 4,176 riders each hour for the only side,
They allocate Nineteen buses on four stations of Route 2020 stations to facilitate the travelling of riders from and to each station. Two of these courses will call at The Gardens Station, and the other two at Al Furjan Station. The taxi services will be accessible at the working stations.
Four Stations
Jebel Ali Station:-
Every one of the four working stations is raised stations. The first is the Jebel Ali Station, an exchange station with the Red Line. The station traverses 8800 square meters in the region and broadens 150 meters long. It can serve 17000 riders each hour during busy times and 320,000 riders each day. The station includes four rail boarding stages, four transport stands, 17 taxi stands and seven stopping spaces for individuals of determination. It additionally offers eight outlets of 388 square meters for business speculation.
The Gardens Station:-
The second is the Gardens station, and it occupies 8100 square meters of area. It includes 168 meters in length. It has the capacity to serve 6770 riders each hour during busy times and 125,000 riders each day. The station contains two rail boarding stages, four transport stands, 20 taxi stands and two stopping spaces for individuals of determination. It likewise offers five outlets of 161 square meters for a business venture.
Revelation Gardens Station:-
The third is the Discovery Gardens which occupies an 8600 square meters area and broadens 168 meters long. It has the capacity to serve 6770 riders each hour during busy times and 125,000 riders each day. The station includes two rail boarding stages, four transport stands, 20 taxi stands and two stopping openings for individuals of determination. It likewise offers four outlets of 149 square meters for a business venture.
Al Furjan Station:-
The fourth is the Al Furjan station spreading over 8400 square meters in the region and broadening 168 meters long. It has the capacity to serve 6770 riders each hour during busy times and 125,000 riders each day. The station includes two rail boarding stages, four transport stands, 20 taxi stands and two stopping spaces for individuals of determination. It additionally offers four outlets of 149 square meters for a business venture.
Limit of Route 2020
Route 2020 has a maximum limit of 46,000 riders each hour in the two ways (23,000 riders each hour for one side). RTA’s evaluations expect the number of riders utilizing Route 2020 to arrive at 125,000 riders each day in 2021 and increment to 275,000 riders by 2030. Studies also uncover that Expo Station is relied upon to serve around 35,000 everyday passengers of Expo during workdays. The number to increment to 47,000 day by day travellers during the ends of the week. This number records for 29% of the full anticipated that several daily visitors should Expo.